Jobbet "Master Thesis - On-line support tool for array cable installation" er udløbet.
Se virksomhedens profil
Se virksomheden
Vis flere job i denne kategori
Vis mig flere job
Få de nyeste job i din indbakke
Opret en jobagent nu

Overall project description 
Wind turbines in large offshore wind farms are interconnected by array cables that gather the power from the wind turbines and collect it at the offshore substation.

During the installation of the array cables, decisions are made on short term due to the variability on the weather conditions. Some of the variables to analyse are:

  • Array cable layout
  • Wind turbine location
  • Number, length and type of cables
  • Water depth
  • Current speed and direction
  • Wave height  - Tide tables
  • Wind direction
  • Number and type of installation vessels
  • Speed of cable installation vessel
  • Vessel constraints and operation
  • Installation method

Detailed project description
The main goal of the project is to develop an on-line tool to support the daily decision making of the cable installation manager.

The project is expected to:

  • review constraints and available information
  • review optimisation methods
  • develop an on-line tool for array cable installation.

Category:
Array cable installation and optimisation

Project type:
Special project followed by master of science thesis project

Number of students:
One or two

Department:
HV Cables

Contact us
Please do not hesitate to contact windthesis@dongenergy.dk if you have further questions.
We look forward to receiving your application as electronic files by 15 June 2015.

Please write in your application that you've seen the job at Jobfinder